
Add to Cart
Span 6 M - 50 M Construction Crane Equipment Load Capacity 20t To 900t For Bridge Construction
Information:
Bridge gantry cranes are gantry cranes specially designed for bridge construction. The lattice girder gantry crane is mainly composed of main girder, outriggers, bridge crowns, etc. The components are connected by pins and high-strength bolts, which are convenient for disassembly, equipment and transportation; compared with ordinary gantry cranes, installation is fast, convenient and economical practical.
As a type of gantry crane, it is a special crane designed for bridge construction. It is composed of main girder, outriggers, bridge crane, etc. All parts are connected by high-strength friction clamping bolts and hinge pins, which are convenient for disassembly and transportation. Compared with ordinary gantry cranes, it is convenient and quick to install, economical and practical. Commonly used in mobile road and bridge construction units.
Specification:
1. Load capacity: 20 t to 900 t
2. Span: 6 m - 50 m
3. Max.Lifting Height: 18m
4. Structurte: Box / truss structure type
6. Character: Single girder/Double griders
7. Power Supply : Diesel generating set /380v-50hz,3Phase A.C
8. Grade ability: 1%-2%
9. Control mode: Remote/Cabin control
10 Running mode:Straight/across/diagonal
11. Image Design: Classic design (Ruby red, ruby blue, white)
Capacity | t | 10 | 16/3.2 | 20/5 | 30/10 | 36/10 | 50/10 | |
Span | m | 18,22,26,30,35 | ||||||
Lifting height | Main | m | 10-12 | 10 | 10-12 | 10-12 | 10-12 | 10-12 |
Aux | m | 11.7-12.7 | 10.6-12.6 | 10.7-12.7 | 11-13 | 11.28-13.28 | ||
Working duty | A5-A7 | |||||||
Speed | Main hoisting | m/min | 18.4 | 13 | 9.2 | 10.4 | 7.7 | 6 |
Aux.hoisting | 18.4 | 18.4 | 13.2 | 8 | ||||
Trolley traveling speed | 43.8 | 41.9 | 42.3 | 42 | 39.1 | 38.13 | ||
Crane traveling speed | 48.4-54.6 | 48-53 | 40.1 | 51.2 | 40 | 43.8 | ||
Installed power | KW | 58-66 | 85-93 | 86-94 | 131-138 | 132-140 | 197-213 | |
Max. weheel load | KN | 299-423 | 198-265 | 218-299 | 292-350 | 334-427 | 270-456 | |
Recommend rail | QU80 | QU70 | QU70 | QU80 | QU80 | QU80/QU70 | ||
Power supply | 380V-50HZ,3Phase A.C |
Application:
It is suitable for frequently flowing road and bridge construction units. Mainly suitable for moving concrete bridges, precast slabs, precast slabs from one place to another. This gantry crane is divided into two types: one is track type and the other is tire type.
Photos:
Packing & Delivery:
1. Delivery time : 90 Days after receiving the deposit.
2. Packaging :
1). Wooden case for electric parts,motor,accessories, color cloth for main structure.
2). All parts will be loaded into 20ft or 40ft ISO container
all parts will be loaded onto Bulk Cargo Ship after package if the length is beyond 12.0m length is beyond 12.0m.
3. Transportation : generally 35 days to 60days to destination port.
4. Trade term : FOB, CFR and CIF are common trade terms, if you need more help, please ontact with Trade Consultant.
5. Load port : Qingdao/Shanghai/Tianjin port.